
standard – standard – কুইজ মডেল টেস্ট অনুশীলন – 1
9387. Over applied overhead would result when
- Overhead costs budgeted for the period exceeds actual overhead cost incurred.
- The plant operated at fewer hours than were budgeted.
- Actual overhead costs incurred exceed overhead applied to production.
- Overhead applied to production exceeds actual overhead costs incurred.
9388. Which type of standard in standard costing, is intended to cover a longer period of time – a period long enough to cover one trade cycle, i.e., roughly 7 to 10 years
- Attainable
- Current
- Basic
- Normal
9389. Which type of standard in standard costing, which can be attained if a standard unit of work is carried out efficiently, a machine properly operated or a material properly used
- Basic
- Current
- Attainable
- Normal
9390. Which type of standard in standard costing, is established for use, unaltered over a long period of time
- Basic
- None of the above.
- Current
- Attainable
আমাদের কাছে থাকা লক্ষ লক্ষ মডেল টেস্ট থেকে প্রাকটিজের জন্য কিছু এখানে তুলে ধরা হল। প্রতিটি অধ্যায়ের উপরে ইশিখন.কম কুইজ চ্যালেঞ্জ এ আছে শত শত মডেল টেস্ট বার বার মডেল টেস্ট দিয়ে নিজেকে যাচাই কর এবং পুরো বাংলাদেশের সকল শিক্ষার্থীর সাথে আপনার মেধা তালিকা দেখুন। প্রশ্নে কোন প্রকার ভুল থাকলে সঠিক উত্তরসহ নিচে কমেন্ট করে জানাবেন, আমরা ঠিক করে দেবো।