758. At the end of the phase, why re-calculation of Control Limits is required?
- To see that if there are any changes
- are they clearly understood and in favorableAll of the above.
- To answer that whether the data is statistically different from Before and After.
- To check that whether the AFTER behavior is expected to represent the future performance in the longer term
759. Which of the following tool is not used in this phase?
- Revised FMEA
- Control Charts
- Anderson Normality Test
- Response Plan
760. What is a part of controlling Key process output variable & key process output variable activity?
- SPC Charts For X’Ss & Y’s
- Re-visit to Hypothesis Testing
- Control Limits Testing
- All of the above.
761. Which of the following statement/statements are true?
- 95% of the population is contained within 2 standard deviations from the mean.
- 68.3% of the population is contained within 1 standard deviations from the mean.
- All of the above.
- 99.7% of the population is contained within 3 standard deviations from the mean
762. What is not an output of Key process output variable & key process output variable control activity?
- Hand off to Process Owner
- New Process Map
- Review of outstanding Action items.
- Writing SOP’S
763. What is a “Primary Metric”?
- Must be consistent with the problem statement
- Defines the success of the project.
- It is used to track progress towards the goals & projects.
- All of the above.
764. Which is not a part of the process for Capturing “Voice of Customer (VOC)”?
- Verbal/Numerical data that identifies customer needs
- A list of customers & customer segments.
- None of the above.
- Define Critical-to-Quality (CTQ’s) requirements as well as specifications for each CTQ.
765. What is the role of Process Owner in a six sigma project?
- They are required to provide the inputs at the beginning of the process.
- They are expected to work in close co-ordination with the Project lead & validate the requirements that have been gathered.
- All of the above.
- He is the person who’s supposed to be in charge of the improved six sigma process.
766. Which tool is not used in this phase?
- Baseline
- Design of Experiments
- SIPOC
- Affinity Diagram
767. Which team type works across time, space and organization boundaries and linked by ICT technologies
- Virtual
- Lean
- Cross-functional
- Continuous improvement
আমাদের কাছে থাকা লক্ষ লক্ষ মডেল টেস্ট থেকে প্রাকটিজের জন্য কিছু এখানে তুলে ধরা হল। প্রতিটি অধ্যায়ের উপরে ইশিখন.কম কুইজ চ্যালেঞ্জ এ আছে শত শত মডেল টেস্ট বার বার মডেল টেস্ট দিয়ে নিজেকে যাচাই কর এবং পুরো বাংলাদেশের সকল শিক্ষার্থীর সাথে আপনার মেধা তালিকা দেখুন। প্রশ্নে কোন প্রকার ভুল থাকলে সঠিক উত্তরসহ নিচে কমেন্ট করে জানাবেন, আমরা ঠিক করে দেবো।