1112. In a manufacturing unit there was a study to understand the correlation between the pressure and steel strength to sustain. For which data was collected for 5 different pressure and the data is like – (P = Pressure)

  1. 21.03
  2. 22
  3. 21
  4. 21.02

1113. Which is not the right example of poka-yoke from the following options

  1. Air shower at the entrance
  2. ATM Machine
  3. Car accelerator
  4. Auto car-door locking system

1114. Which technique increases process stability if variation is due to cluttered work station?

  1. SMED
  2. Visual factory
  3. Preventive maintenance
  4. 5S

1115. Which control chart is suitable for monitoring the number of defects on different sample sizes?

  1. np
  2. c
  3. u
  4. p

1116. Control Plan is a document based approach to control:

  1. None of the above
  2. Variation
  3. Data Collection
  4. P-D-C-A

1117. Poka-yoke is best defined as

  1. reducing field failures to virtually zero
  2. capturing the voice of the customer
  3. preventing controllable defects
  4. improving machine efficiency

1118. What is the best stated in reference to significance of control charts.

  1. All of the above
  2. It aids in process stability
  3. It serves as basis for making judgment w.r.t. product and process variation
  4. It helps in understanding process capabilities

1119. Which is not the part of a 5ME approach analysis

  1. M: Machine
  2. M: Measurement
  3. M: Management
  4. M: Manpower

1120. What is the objective of using the control chart?

  1. detect the causes of nonconformities
  2. determine if the process is performing within specifications
  3. determine how to recreate the process
  4. evaluate process performance over time

1121. In a Fabrication lab, it was revealed over a study carried by designated team that the particle size of dust ranging from 5 to 10 microns are creating defects resulting in yield loss. So after understanding the problem Black belt team in conjunction with lab team installed an air shower path of 5 metres at the entrance gate through which every operator has to walk away for their respective work. Which lean tools would be most appropriately described here

  1. KAIZEN
  2. POKA-YOKE
  3. KANBAN
  4. All of the above

আমাদের কাছে থাকা লক্ষ লক্ষ মডেল টেস্ট থেকে প্রাকটিজের জন্য কিছু এখানে তুলে ধরা হল। প্রতিটি অধ্যায়ের উপরে ইশিখন.কম কুইজ চ্যালেঞ্জ এ আছে শত শত মডেল টেস্ট বার বার মডেল টেস্ট দিয়ে নিজেকে যাচাই কর এবং পুরো বাংলাদেশের সকল শিক্ষার্থীর সাথে আপনার মেধা তালিকা দেখুন। প্রশ্নে কোন প্রকার ভুল থাকলে সঠিক উত্তরসহ নিচে কমেন্ট করে জানাবেন, আমরা ঠিক করে দেবো।

Leave a Reply

স্যার, কিভাবে আপনাকে সাহায্য করতে পারি?

Click one of our representatives below

Customer Support
Customer Support

Syeda Nusrat

I am online

I am offline

Technical Support
Technical Support

Ariful Islam Aquib

I am online

I am offline