798. If the USL and LSL are both set to be 6? (six sigma!) away from the mean, then a maximal process shift of 1.5? would still produce the magical number of _______ defective parts per million (PPM).

  1. 66800
  2. 6210
  3. 230
  4. 3.4

799. A ____________________ Analysis chart is used to gauge the positioning of stakeholders relative to change and represents the impacted people both inside and outside the system relative to the change.

  1. Pareto
  2. Stakeholder
  3. Decision Matrix
  4. Impact-Control

800. What is Effort-Impact matrix?

  1. It is a 2 x 2 grid that helps the team assess solutions.
  2. All of the above
  3. It provides a quick & easy way to filter out solutions that might not be worth the effort.
  4. It is used to help the project team to decide which of the numerous solutions to implement appear to be of least effort (easiest) while having the most favorable (high) impact

801. In a 5S, once the unwanted stuff is cleared, the next step is to organize and arrange the exiting items in a neat and easily accessible manner. What is this step called?

  1. Set in order
  2. Standardize
  3. Sort
  4. Sustain

802. Which of the following is not a part of PDCA?

  1. Inspection & checking.
  2. Execution of process improvement Plan.
  3. Identification of pain areas for the process
  4. Integration of the improvement plan in the system

803. When does np chart is used

  1. Depends upon process
  2. for defectives – sample size varies
  3. Depends upon objective
  4. for defectives – sample size fixed

804. What is Weighted Criteria Matrix?

  1. It helps you decide between competing solutions ideas that are mutually exclusive.
  2. It helps you understand the solutions’ expense and impact on others by driving discussion.
  3. It’s a great communication tool.
  4. All of the above

805. What is analyzed to determine the degree of their effect on a process, in SPC

  1. Depends upon objective
  2. KPIV
  3. KPOV
  4. Depends upon process

806. What is/are the Objective of SPC Chart?

  1. It helps in monitoring process performance and maintenance of control with adjustments only when necessary and with caution not to over adjust
  2. They are used to analyze process performance by plotting data points control limits and a centerline
  3. All of the aboveIt saves unnecessary inspection adjustments and prevents trouble by being proactive &amp helps to control to assess the process capability

807. What should be measurable before starting DOE

  1. Factors
  2. Responses
  3. None of the above
  4. Responses and Factors

আমাদের কাছে থাকা লক্ষ লক্ষ মডেল টেস্ট থেকে প্রাকটিজের জন্য কিছু এখানে তুলে ধরা হল। প্রতিটি অধ্যায়ের উপরে ইশিখন.কম কুইজ চ্যালেঞ্জ এ আছে শত শত মডেল টেস্ট বার বার মডেল টেস্ট দিয়ে নিজেকে যাচাই কর এবং পুরো বাংলাদেশের সকল শিক্ষার্থীর সাথে আপনার মেধা তালিকা দেখুন। প্রশ্নে কোন প্রকার ভুল থাকলে সঠিক উত্তরসহ নিচে কমেন্ট করে জানাবেন, আমরা ঠিক করে দেবো।

Leave a Reply

স্যার, কিভাবে আপনাকে সাহায্য করতে পারি?

Click one of our representatives below

Customer Support
Customer Support

Syeda Nusrat

I am online

I am offline

Technical Support
Technical Support

Ariful Islam Aquib

I am online

I am offline