green-belt – belt – কুইজ মডেল টেস্ট অনুশীলন – 3
738. Select the statement that describes “Analyze Phase”.
- Establishment of valid & reliable metrics to help monitor the progress.
- Use of Descriptive Statistics to determine current Baseline.
- Use of planning & management tools to implement new approach
- Establishment of specific activities that is necessary to meet project goals.
739. What is Confidence Interval?
- CI = P value-1
- Used to quantify the uncertainty by providing a lower limit and upper limit that represent a range of values that will represent the true population parameter with a specified level of confidence.
- All of the above.
- CI = alpha-1
740. In reference to a Z-Test, which of the following statement/statements are true?
- All of the above.
- Used when analyzing the samples of a BEFORE and AFTER situation and the number of samples must be the same.
- Uses a set of data and test a point of interest & returns the one-tailed probability.
- The value is the same as a z-score.
741. Which of the following also refers to one-way ANOVA test
- Extended t test
- One factor at a time experiment
- None of these
- All of these
742. What will be direction of x and y if the correlation value is -1
- no relationship
- None of the above
- opposite
- same
743. The price at which a market maker is prepared to buy (a currency) or borrow (money) is
- forward rate
- sport rate
- bid rate
- offer rate
744. What is Standardization?
- It is used as a method to improve efficiencies in processes that have great variation.
- All of the Above.
- It helps in sustaining the process
- It is used to maximize compatibility & quality of the process.
745. What is Project Documentation?
- All of the Above.It is used to capture the new process that was created during Improve phase
- reviewed and updated as necessary to reflect any modifications that may have occurred during roll out.It is used for keeping the whole process on track; for enabling us to spot trouble and fix it; and for judging how effectively the project was executed and implemented.
- Its basic purpose is to control the inputs to have stable outputs in projects.
746. What is/are the objective of this phase?
- To determine the final capability.
- All related changes are documented on the closing contract.
- All of the above
- To document the new process and pass that structure on to the employees who work within the process.
747. What is Operating Rhythm?
- It is a robust preventive maintenance program used for tracking and execution of the implemented process.It is a key component of the documentation of the new process
- used to have a user guide which spells out the steps of the process and provides rationale.It is a set of structured
- mutually dependent interactions that manages and shows performance information to allow the stakeholder to effectively and proactively express control operations.It is used to enhance the understanding of process variation making it easier to take action to reduce special cause variation and improve ongoing process performance.
আমাদের কাছে থাকা লক্ষ লক্ষ মডেল টেস্ট থেকে প্রাকটিজের জন্য কিছু এখানে তুলে ধরা হল। প্রতিটি অধ্যায়ের উপরে ইশিখন.কম কুইজ চ্যালেঞ্জ এ আছে শত শত মডেল টেস্ট বার বার মডেল টেস্ট দিয়ে নিজেকে যাচাই কর এবং পুরো বাংলাদেশের সকল শিক্ষার্থীর সাথে আপনার মেধা তালিকা দেখুন। প্রশ্নে কোন প্রকার ভুল থাকলে সঠিক উত্তরসহ নিচে কমেন্ট করে জানাবেন, আমরা ঠিক করে দেবো।